
To solve the depth limitation of handheld augers for 2–3m deep holes like PV piles and utility pole foundations, the newly launched tall vertical stand spiral drill is equipped with 2-stroke & 4-stroke dual engines. The elevated aluminum stand with hand winch lifting system eliminates heavy manual holding and pressing, allowing a single operator to drill ultra-deep vertical holes effortlessly.
Core Machine Features
1.Tall Lightweight Stand Frame
Thickened elevated aluminum frame is light and rust-proof. The hand-crank chain lifting system precisely controls auger movement. Transport wheels at the base support easy relocation on farmland and construction sites, while triangular support feet guarantee stable placement.
2.Two Power Options
2-Stroke Version: Runs on mixed gasoline and engine oil, delivers instant high torque. Ideal for scattered small deep holes and large tree planting pits with convenient short-distance transport.
4-Stroke Version: Uses straight gasoline only, featuring low vibration and noise. It withstands all-day continuous operation without overheating, perfect for mass deep-hole PV and power construction projects.
Splicable Extended Auger Rods
3.Segmented augers reach a maximum drilling depth of 3 meters. Widened spiral blades discharge soil automatically to form straight, collapse-free holes. Interchangeable drill bits from 4cm to 35cm fit all sizes of ground anchors, utility poles and greenhouse posts.
Step-by-Step Operation Guide
1.Roll the machine to the target spot and lock the triangular support feet for stability.
2.Assemble extended auger sections and install the drill bit matching required diameter.
3.Refuel according to engine type, then pull the recoil starter to start the machine.
4.Turn the hand winch handle slowly to lower the auger, spiral blades dig and remove soil automatically.
5.Lift the auger by reversing the crank once target depth is reached. Soil piles beside the finished hole, then roll the machine to the next position.
Applicable Construction Scenarios
1.PV New Energy: Deep foundation holes and ground anchors for solar support frames
2.Power & Communication: Buried pits for utility poles and surveillance signal posts
3.Agriculture & Landscaping: Deep planting pits for mature fruit trees and landscape saplings
4.Greenhouse Farming: Deep embedment holes for long greenhouse posts and livestock fence piles
5.Civil Protection Works: Vertical deep holes for slope stabilization stakes and small foundation piles
Unique Competitive Advantages
1.The tall vertical stand removes heavy handheld labor and prevents waist strain for operators;
2.Hand winch controls drilling speed accurately to avoid deviation on hard clay soil;
3.Built-in transport wheels eliminate manual lifting, greatly improving relocation efficiency for large-scale projects;
4.Dual power choices fit light and heavy workloads, extended augers break depth limits of traditional augers, cutting massive labor input and construction periods.
Address:Zhitian Economic Development Zone, Gongyi, Zhengzhou City, Henan Province
WhatsApp:+8615225155386
Wechat: 15225155386
E-mail:Jenny8802@163.com